RGD
Engineers, a multidisciplinary engineering firm based out of Jupiter, will
provide mechanical, electrical, and structural design and management for the megachurch
set to be built in the empty Dillard’s store at the Boynton Beach Mall. The church
is not expected to open until January 2014.
The church, a branch of Christ
Fellowship, will renovate the 127,000 square-foot property in order to serve
what is estimated to be about 9,000 worshippers each Sunday. The renovation
plans will include gutting the entire department store to convert it into a
1,500-seat theater.
The RGD Engineering firm will be in
charge of the mechanical, electrical, and structural design for the church and
will provide on-site management for the duration of the project. The goal is to
provide innovative cost effective designs that are safe, code compliant and always
energy efficient. RGD will work closely
with Beck Architecture, a Dallas based firm, to ensure that careful attention
is paid to all details involved in the preparation and execution of each design
aspect of the project.
It is estimated that the project will
create 348 construction jobs and 35 permanent jobs with a payroll of more than
$1.5 million.
No comments:
Post a Comment